Honest Charge Site Analysis

An evaluation that is allowed to say no.

Use case → demand → dwell time → existing service → required capacity → site constraints → charger mix → load management → storage and generation → economics → phased deployment.

Eight study stages

  1. STAGE 1

    Site and commercial use case

    • Site location and property type
    • Ownership or operating authority
    • Intended users and vehicle categories
    • Existing charging infrastructure
    • Expected traffic or fleet activity
    • Operating hours and charging objectives
  2. STAGE 2

    Charging demand

    • Vehicles requiring service and sessions
    • Energy per session; daily and annual energy
    • Dwell times and charging windows
    • Concurrent charging requirements
    • Expected utilization
  3. STAGE 3

    Electrical screening

    • Utility provider and existing service
    • Historical demand and building loads
    • Transformer arrangements
    • Potential expansion and utility constraints
    • Documentation of incomplete or unverified information
  4. STAGE 4

    Physical site evaluation

    • Parking layout and equipment location
    • Charger access and accessibility
    • Trenching distances and civil construction
    • Site safety and expansion space
  5. STAGE 5

    Charging architecture

    • Level 2 versus DC fast charging
    • Initial charger quantity and power ratings
    • Load sharing and managed charging
    • Networking and fleet operating requirements
  6. STAGE 6

    Energy integration

    • Solar canopies, battery storage, demand management
    • Building efficiency and microgrid integration
    • Recommended only where they solve a demonstrated problem — never because related network businesses exist
  7. STAGE 7

    Financial evaluation

    • Capital costs, utility charges, operating expenses
    • Revenue or avoided costs
    • Utilization and maintenance assumptions
    • Sensitivities and principal risks
  8. STAGE 8

    Recommendation

    • Proceed · Proceed in Phases · Redesign · Defer · Do Not Proceed
    • With the reasoning that supports it

Analyses are decision-support studies based on available information and stated assumptions. They are not stamped engineering designs, utility commitments, or construction documents; licensed professionals and your utility must be engaged for those.

Engagement types

  • Preliminary Site Screening

    A bounded review identifying major opportunities, constraints, and whether further study is warranted.

  • Commercial Charging Feasibility Study

    A detailed evaluation of demand, electrical infrastructure, site conditions, charging architecture, and economics.

  • Infrastructure Development Planning

    A scoped engagement covering phased installation, utility coordination, procurement considerations, implementation planning, and partner coordination.

Each engagement is scoped to the property. Request a study scope and fee quotation below.

Request a site evaluation

Share only what you know today. We'll review it, ask follow-up questions, and propose an appropriate scope.

Please don't send utility account numbers or financial records with an initial inquiry.

How this form sends: online submission is not yet connected. When you continue, your inquiry is prepared as an email to partners@geenergygroup.com in your own email app for you to send. You can also email us directly.

Or email partners@geenergygroup.com directly.