Honest Charge Site Analysis
An evaluation that is allowed to say no.
Use case → demand → dwell time → existing service → required capacity → site constraints → charger mix → load management → storage and generation → economics → phased deployment.
Eight study stages
STAGE 1
Site and commercial use case
- Site location and property type
- Ownership or operating authority
- Intended users and vehicle categories
- Existing charging infrastructure
- Expected traffic or fleet activity
- Operating hours and charging objectives
STAGE 2
Charging demand
- Vehicles requiring service and sessions
- Energy per session; daily and annual energy
- Dwell times and charging windows
- Concurrent charging requirements
- Expected utilization
STAGE 3
Electrical screening
- Utility provider and existing service
- Historical demand and building loads
- Transformer arrangements
- Potential expansion and utility constraints
- Documentation of incomplete or unverified information
STAGE 4
Physical site evaluation
- Parking layout and equipment location
- Charger access and accessibility
- Trenching distances and civil construction
- Site safety and expansion space
STAGE 5
Charging architecture
- Level 2 versus DC fast charging
- Initial charger quantity and power ratings
- Load sharing and managed charging
- Networking and fleet operating requirements
STAGE 6
Energy integration
- Solar canopies, battery storage, demand management
- Building efficiency and microgrid integration
- Recommended only where they solve a demonstrated problem — never because related network businesses exist
STAGE 7
Financial evaluation
- Capital costs, utility charges, operating expenses
- Revenue or avoided costs
- Utilization and maintenance assumptions
- Sensitivities and principal risks
STAGE 8
Recommendation
- Proceed · Proceed in Phases · Redesign · Defer · Do Not Proceed
- With the reasoning that supports it
Analyses are decision-support studies based on available information and stated assumptions. They are not stamped engineering designs, utility commitments, or construction documents; licensed professionals and your utility must be engaged for those.
Engagement types
Preliminary Site Screening
A bounded review identifying major opportunities, constraints, and whether further study is warranted.
Commercial Charging Feasibility Study
A detailed evaluation of demand, electrical infrastructure, site conditions, charging architecture, and economics.
Infrastructure Development Planning
A scoped engagement covering phased installation, utility coordination, procurement considerations, implementation planning, and partner coordination.
Each engagement is scoped to the property. Request a study scope and fee quotation below.