Charging Applications
Different sites charge for different reasons.
Each application has its own users, timing, energy needs, and risks. None is universally profitable. Start by understanding which describes your property — and where it doesn't fit.
Workplace Charging
Employee parking with long, predictable dwell. Participation is voluntary and changes as EV adoption among staff changes.
- Who charges
- Employees, and sometimes visitors or pooled company vehicles.
- When
- Weekday business hours, often clustered at morning arrival.
- Energy required
- Typically a commute's worth per session — often far less than the battery's capacity. Survey commute distances rather than assuming full charges.
- Dwell time
- Commonly 6–9 hours, which allows low per-port power.
- Technology
- Level 2, frequently with power sharing across ports; shared connectors with move-your-car policies.
- Electrical implications
- Simultaneous morning arrival can create a coincident peak unless sessions are managed.
- Operations
- Employer policy on pricing, eligibility, etiquette, accessible spaces, and taxable-benefit questions (confirm with a tax advisor).
- Economic risks
- Paying for capacity employees don't use; free charging creating demand that drives cost.
- When not justified
- Few EV drivers, short tenancy or lease remaining, or service upgrades out of proportion to benefit.
Fleet and Depot Charging
Charging is a production input: vehicles must be ready for their next route. Reliability and schedule govern design.
- Who charges
- Owned or leased fleet vehicles — vans, trucks, buses, service vehicles.
- When
- Mostly overnight after return-to-base; sometimes midday opportunity charging.
- Energy required
- Derived from duty cycle: daily miles × vehicle efficiency, adjusted for weather, payload, and auxiliary loads.
- Dwell time
- Defined by the shift schedule — the charging window between return and departure.
- Technology
- Level 2 or lower-power DC for long windows; higher-power DC where turnaround is short.
- Electrical implications
- Many vehicles charging simultaneously can create the largest sustained load on the site. Managed charging against departure times is central.
- Operations
- Vehicle assignment, charger-to-bay mapping, telematics integration, and a plan for charger or utility outages.
- Economic risks
- Oversizing for a future fleet that arrives slowly; undersizing and stranding vehicles.
- When not justified
- Vehicle procurement timing is unsettled, routes exceed current vehicle range, or the depot lease is uncertain. Phased infrastructure is often the answer.
Destination Charging
Hotels, retail, entertainment venues, offices, and shopping centers where charging supports a visit rather than being the reason for it.
- Who charges
- Guests, shoppers, and visitors.
- When
- Matches the venue's traffic pattern — evenings for hotels, weekends for retail.
- Energy required
- Varies with stay length; overnight hotel guests may take much more than a short shopping visit.
- Dwell time
- From under an hour to overnight.
- Technology
- Level 2 for long stays; DC fast only where short visits and corridor traffic support it.
- Electrical implications
- Usually moderate for Level 2; DC fast can dominate building demand.
- Operations
- Space enforcement, signage, guest support, uptime, and payment experience.
- Economic risks
- Indirect benefits (visit length, loyalty, rate premium) are real but hard to measure.
- When not justified
- Little EV traffic, very short dwell for Level 2, or costs the amenity value cannot support.
Public Fast Charging
Charging is the product. This is the most capital- and utilization-sensitive application.
- Who charges
- The public, including travelers and drivers without home charging.
- When
- Follows traffic patterns; corridor sites peak with travel periods.
- Energy required
- Often a partial charge to continue a trip; set by vehicle charging curves.
- Dwell time
- Short — typically under an hour.
- Technology
- DC fast charging with multiple connector types (CCS, SAE J3400/NACS) and reliable payment.
- Electrical implications
- High capacity needs; frequently requires new service or transformer work and long utility lead times.
- Operations
- Uptime is the reputation. Requires monitoring, rapid repair, lighting, amenities, and customer support.
- Economic risks
- Demand charges against low early utilization; competition; equipment obsolescence.
- When not justified
- Weak traffic, nearby competing capacity, unworkable utility timelines, or no viable operator arrangement.
Commercial Parking Facilities
Garages and surface lots with long-duration parking, shared spaces, and controlled access.
- Who charges
- Monthly permit holders, daily parkers, and event parkers.
- When
- Business-day or event-driven.
- Energy required
- Usually modest relative to dwell.
- Dwell time
- Hours to all day.
- Technology
- Level 2 with load management; access-controlled charging.
- Electrical implications
- Structures may have limited spare capacity; conduit routing in garages can be costly.
- Operations
- Integration with parking access and payment; reserved versus shared spaces.
- Economic risks
- Bundling charging into parking fees without understanding cost.
- When not justified
- Structural or routing costs are high relative to demand, or parkers rarely stay long enough.
Multifamily and Mixed-Use Properties
Residents depend on shared parking. Billing, fairness, and electrical allocation are the hard parts.
- Who charges
- Residents, and sometimes guests or commercial tenants.
- When
- Evenings and overnight.
- Energy required
- Daily driving needs — often modest per session.
- Dwell time
- Overnight, favoring low-power Level 2.
- Technology
- Level 2 with power sharing; assigned versus shared spaces determine port count.
- Electrical implications
- Overnight coincidence across many units; existing house-panel capacity is often limited.
- Operations
- Resident access, billing method, lease terms, HOA or owner approvals, and who owns the equipment.
- Economic risks
- Cost recovery from residents; equipment ownership disputes; unused assigned ports.
- When not justified
- Insufficient capacity without disproportionate upgrades, or no workable billing and governance model.
Industrial and Commercial Properties
Large sites combining employee, service, and logistics vehicles, often with existing heavy electrical loads.
- Who charges
- Employees, service vehicles, yard equipment, and logistics fleets.
- When
- Shift-dependent; can coincide with process loads.
- Energy required
- Ranges from commute top-ups to heavy-duty fleet demand.
- Dwell time
- Shift-length for employees; schedule-driven for fleets.
- Technology
- Mixed Level 2 and DC, segmented by user group.
- Electrical implications
- Existing process loads may leave little headroom — or significant off-peak capacity worth using.
- Operations
- Safety in truck yards, separation of user groups, and coordination with facility operations.
- Economic risks
- Raising the facility's peak demand; disrupting production.
- When not justified
- Charging would push facility peak into costly territory without load management, or user groups are too small.
Not sure which application describes your property?
An Honest Charge Site Analysis tests demand, electrical capacity, site conditions, and economics — and can conclude that you should not build.
How the analysis works