Project Economics
A charging project is a capital investment. Model it like one.
Costs, revenue, and risk vary enormously by site. The tools below are how to reason about them — outputs of a model, never guaranteed outcomes.
Capital expenses
| Category | Notes |
|---|---|
| Charging hardware | Ports, cables, pedestals or wall mounts, cable management. |
| Installation | Electrical labor and materials from panel to charger. |
| Engineering & design | Load calculations, drawings, permitting packages. |
| Utility upgrades | Service extension and customer contributions under utility policy. |
| Transformer & switchgear | New or upgraded equipment, often a dominant cost for DC. |
| Trenching & civil | Boring, conduit, pads, pavement restoration, bollards. |
| Networking & commissioning | Activation, configuration, testing, initial software. |
| Site preparation | Striping, signage, lighting, accessibility improvements. |
| Contingency | Allowance for unknowns — especially before utility scope is confirmed. |
Operating expenses
- Electricity consumption (kWh) at the applicable rate.
- Demand charges (kW) based on peak interval demand — see the home-page example of how low utilization magnifies them.
- Network subscriptions per port, recurring.
- Payment transaction fees.
- Maintenance and repairs, including service contracts.
- Insurance considerations for equipment and liability.
- Administrative overhead — billing, support, reporting.
- Replacement reserves — equipment life is typically shorter than the electrical infrastructure behind it.
Revenue models
- Direct charging fees — per kWh, per hour, session, or idle fees.
- Workplace arrangements — free, subsidized, or cost-recovery charging for employees.
- Fleet cost optimization — value is avoided fuel and maintenance, not charging revenue.
- Destination amenity — value through visits, stays, or rent premiums.
- Parking + charging — bundled or premium spaces.
- Host/operator structures — the host provides the site; an operator owns or runs equipment under a lease or revenue share. Terms allocate capital, risk, and upside.
Direct revenue is measurable. Indirect benefits — tenant retention, guest loyalty, sustainability goals — may be real but should be stated separately and conservatively.
Financial measures
| Measure | What it tells you |
|---|---|
| Capital investment | Total up-front cost, net of any confirmed incentives. |
| Annual operating expense | All recurring costs including demand charges and reserves. |
| Gross charging revenue | Fees collected before costs. |
| Net operating cash flow | Revenue (or avoided cost) minus operating expense. |
| Simple payback | Capital ÷ annual net cash flow. Ignores time value and lifespan. |
| Net present value (NPV) | Discounted future cash flows minus capital. Positive means returns exceed the chosen discount rate. |
| Internal rate of return (IRR) | Discount rate at which NPV equals zero. |
| Sensitivities | How results move with utilization, electricity price, demand charges, maintenance, and replacement assumptions. |
NPV = −C₀ + Σ (CFₜ ÷ (1 + r)ᵗ), t = 1…N C₀ = initial capital, CFₜ = net cash flow in year t, r = discount rate, N = analysis years
Worked example: small public DC site
Every number below is an assumption chosen for illustration:
- Installed capital C₀ = $400,000 after any confirmed incentives.
- Throughput 6,000 kWh/month; price charged $0.45/kWh.
- Energy cost $0.10/kWh; demand 300 kW × $10/kW-month.
- Network, payment, and maintenance $1,500/month.
- 10-year life, 8% discount rate, no growth, no salvage.
Monthly revenue = 6,000 × $0.45 = $2,700 Energy cost = 6,000 × $0.10 = $600 Demand cost = 300 × $10 = $3,000 Other O&M = $1,500 Monthly net = 2,700 − 600 − 3,000 − 1,500 = −$2,400 Annual net = −$28,800 → no payback; NPV ≈ −$593,000
Now assume throughput triples to 18,000 kWh/month and managed charging caps the peak at 200 kW:
Revenue = 18,000 × 0.45 = $8,100 Energy = 18,000 × 0.10 = $1,800 Demand = 200 × 10 = $2,000 Other O&M = $1,500 Monthly net = $2,800 → annual $33,600 Simple payback = 400,000 ÷ 33,600 ≈ 11.9 years (longer than the 10-year life) NPV @ 8%, 10 yr = −400,000 + 33,600 × 6.710 ≈ −$174,500
Even with triple the throughput the example does not recover capital within its assumed life. Lower capital, phased installation, higher utilization, or a different business model would be needed — exactly the kind of finding a feasibility study should surface before construction.
Illustrative only. Figures are assumptions chosen to show the method, not quotes, tariffs, or expected results.
Sensitivity analysis
A credible model shows how results change when the uncertain inputs move: utilization (usually the largest driver), electricity price, demand-charge exposure, maintenance and repair cost, equipment replacement timing, and incentive certainty. If a project only works under optimistic assumptions on several inputs at once, that is a material risk.
Limitations and risks
Do not rely on equipment-vendor revenue projections without seeing their utilization assumptions. Utility tariffs and incentives must be confirmed for the specific site and date.